The Bill Reducer
600W microinverter with a Wi-Fi energy meter. Feeds straight into your flat's existing wiring and quietly shaves your monthly bill — no battery, minimal footprint.
Plug-in solar for high-rise balconies. No drilling into the railing, no RWA approval queue, no DISCOM net-metering paperwork. It clips on, plugs into a 16A socket, and starts cutting your bill the same day.
High-rise living in the Tricity comes with a specific kind of powerlessness: the roof belongs to the RWA, the wiring belongs to the builder's plan, and every summer the grid buckles right when your AC needs it most.
Rooftop solar needs society sign-off that rarely comes fast — if it comes at all.
DISCOM approvals, load studies, inspection visits — months of paperwork before a single panel goes up.
Peak-load afternoons mean the exact hours you need backup are the hours it's least reliable.
Move the slider to your average monthly electricity bill for an indicative estimate. Your exact figure is confirmed after the free feasibility check.
Indicative only — assumes typical Tricity sun-hours and a south/west-facing balcony. Final numbers are confirmed during your on-site inspection, before any advance is collected.
Three panel tiers based on balcony length, and two power configurations depending on whether you're cutting your bill or preparing for the next outage.
600W microinverter with a Wi-Fi energy meter. Feeds straight into your flat's existing wiring and quietly shaves your monthly bill — no battery, minimal footprint.
UTL Gamma Plus 1kVA MPPT hybrid inverter with a 100Ah LiFePO4 battery. Keeps your fans, Wi-Fi, and lights running straight through a summer outage.
You never pay to find out if your balcony qualifies — you only pay once someone has stood on it.
Tell us your balcony's direction, length, floor, and plug access. We suggest a tier instantly.
Grid-Tied or Hybrid, upload two photos of the railing and the view.
We visit your exact flat and floor to confirm the install is sound before anything is booked.
Brackets go up, tether is secured, panel is plugged in. Most installs finish in an afternoon.
The name is about the approval process, not the electricity. Grid-Tied kits still work with your existing connection — you just skip the net-metering queue. Hybrid kits give you a private grid of your own for the hours the real one goes down.
Every install is inspected in person before a single rupee changes hands.
If your society falls within these belts, a feasibility check can usually be scheduled within the week.
Free feasibility check, no advance required to book it.
Check My Balcony